24. UP1A

Strength tests, tightness tests and purging for larger installations to IGE/UP/1A, worked out step by step, and saved to the customer's property.

  1. 1What you're doing

    The installation type, gas and pressure, then which of the three you need: strength test, tightness test, purge.

    What you're doing
  2. 2Pipework

    One page: the meter, each run of pipe and, for a purge, the hose. The installation volume stays at the top with a bar up to the 1 m³ UP/1A limit; go over it, or use a pipe over 150 mm, and GasPass tells you straight away.

    Pipework
  3. 3Purge hose

    The hose you purge through, with its own volume, on the same page.

    Purge hose
  4. 4Test details

    The pressure gauge and, for an existing installation, the test medium and the room the pipework runs through.

    Test details
  5. 5Results

    Everything on one page: the installation volume, then each test with its pressures and times up top, and the purge volume, flow and time. Export a PDF, or send the figures to a certificate.

    GasPass shows the standard each answer comes from. Always check results against the current standard and the manufacturer's instructions.

    Results
  6. 6Save it to the property

    Save, then choose the customer and their property. The figures sit in the property's Work tab, and under Tests in Completed.

    Save it to the property
  7. 7Open it any time

    Where and when, and every figure. Copy, share, or make the PDF again.

    Open it any time